• info@daamco.com
  • Airport road
 Installing a reducer for the main gas line

Installing a reducer for the main gas line

Project Details

NOC

2015

Installing a reducer for the main gas line (42) in the Terfas well area, south of Al-Zawiya. The work was completed in the required manner, with accuracy and high quality.